翻訳と辞書
Words near each other
・ Santo António Church
・ Santo António da Charneca
・ Santo António da Serra
・ Santo António da Serra (Machico)
・ Santo António da Serra (Santa Cruz)
・ Santo António de Nordestinho
・ Santo António dos Cavaleiros e Frielas
・ Santo António dos Olivais
・ Santo António, Macau
・ Santo Antônio
・ Santo Antônio (Maio)
・ Santo Antônio da Alegria
・ Santo Antônio da Barra
・ Santo Antônio da Patrulha
・ Santo Antônio da Platina
Santo Antônio Dam
・ Santo Antônio das Missões
・ Santo Antônio de Goiás
・ Santo Antônio de Jesus
・ Santo Antônio de Lisboa (disambiguation)
・ Santo Antônio de Lisboa, Piauí
・ Santo Antônio de Lisboa, Santa Catarina
・ Santo Antônio de Posse
・ Santo Antônio de Pádua
・ Santo Antônio do Amparo
・ Santo Antônio do Aracanguá
・ Santo Antônio do Aventureiro
・ Santo Antônio do Caiuá
・ Santo Antônio do Descoberto
・ Santo Antônio do Grama


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Santo Antônio Dam : ウィキペディア英語版
Santo Antônio Dam

The Santo Antônio Dam is a hydroelectric dam on the Madeira River southwest of Porto Velho in the state of Rondônia, Brazil. The dam's run-of-the-river hydroelectric power station will have 50 turbines each rated at 71.6 MW resulting in a total installed capacity of 3,580 MW. The first unit began commercial production in March 2012,〔(HydroWorld: Developing Santo Antonio: A Focus on Sustainability )〕 and as of June 2015 a total of 32 units are operational, with completion scheduled for November 2016.〔http://www.santoantonioenergia.com.br/energia/energia1/〕〔(【引用サイトリンク】url=http://www.gdfsuez.com/en/activities/our-energies/hydraulic-energy/the-future-with-hydraulic-energy/ )〕 Most of the power will be exported to south-eastern Brazil via the Rio Madeira HVDC system.
The dam is part of a planned four power plant Madeira river hydroelectric complex, which will consist of two dams in Brazil (Santo Antônio and 3,750 MW Jirau Dam about 100 km upstream), a third on the border of Brazil and Bolivia (Guayaramerin), and a fourth station inside Bolivia (Cachuela Esperanza). The Jirau Dam is currently under construction, while the smaller upstream dams are still in the planning stages. In part due to the 2001-2002 power shortage in Brazil, construction of both dams was accelerated in 2009. The total estimated cost of the two facilities currently under construction is $15.6 billion ($7 billion for Santo Antônio), including about $10 billion for the civil engineering and power plants, and $5 billion for ship locks, transmission lines, and environmental re-mediation.〔(【引用サイトリンク】url=http://www.waterworld.com/index/display/article-display/318309/articles/water-wastewater-international/volume-22/issue-6/editorial-spotlight/brazil-to-build-156-billion-in-dams-in-amazon-region.html )〕 The Madeira river hydroelectric complex is part of the Initiative for the Integration of the Regional Infrastructure of South America, an effort by South American governments to integrate the continent's infrastructure with new investments in transportation, energy, and communication.
==Design==
The Santo Antônio Dam is designed as a run-of-the-river hydroelectric dam and power plant. The dam itself is tall and long, creating a reservoir with a surface area of , of which is the previously existing river channel. The dam's power plant consists of 50 Kaplane-bulb turbines turbines, each capable of 71.6MW (total installed capacity of 3,580 MW) divided into four sets. The original project called for 44 turbines, but this was expanded in 2013. The power plant will have a maximum discharge of . The dam will have two spillways; one on the main section and an auxiliary on the southern abutment. Both spillways will have a combined maximum discharge of to control reservoir levels. The dam will also support two fish ladders and a shipping lock.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Santo Antônio Dam」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.